The replacement of the old stationary crusher was completed within one hour (Fig. 2). With a mobile crane, the 85 t crusher was fitted with millimetre precision into the crusher building. Following positioning of the new crusher in the existing steel structure, it was important to optimally secure the crusher despite the confined space available.